Clients & Testimonials

  • Lyonsdale Biomass, LLC – Lyons Falls, New York
    Temporarily implemented Neural – Max supervisory operational control system, as facility was experiencing significant CO emissions and struggling to maintain steam load. Within 1 week of system implementation and fine tuning, plant was running at maximum steam production capacity with no emissions issues. Reconfigured entire control system and created new control system philosophy.
  • Gray’s Harbor Paper – Hoquiam, Washington
    Complete Neural – Max system implementation and multi – boiler optimization
  • Simpson Paper – Tacoma, Seattle
    Optimization and Cogeneration support project
  • Duffin Creek Water Pollution Control Plant – Pickering, Ontario
    Control and reporting system with GE Fanuc 90 – 30 PLC’s and Wonderware on sewage sludge fluidized bed incinerator.
  • Miller Western Pulp – Whitecourt, Alberta
    Implemented FOCUS HSDA on a sunds slab press resulting in a cycle time decrease on the press leading to $15,000 per day more production.
  • California Steel Inc. – Fontana, California
    Implemented FOCUS HSDA on the galvanizing line. Unplanned shutdowns were dramatically reduced and the system payback was 3 months or less.
  • Tembec Pulp and Paper – Smooth Rock Falls, Ontario
    Updated configuration of Bailey Net 90 controlling a vibrating grate hog (wood waste) fired boiler. In conjunction with Balance Power Engineering control and mechanical modifications successful increased steam production from 80,000 lbs/hr to over 150,000 lbs/hr.
  • Tembec Pulp and Paper – Kapuskasing, Ontario
    Modified existing bailey symphony system on 3 KmW bark fired combustor furnaces. Reduced greenhouse gases by 65% and increased steam production by 30%. Combined steam increase and reduction of gas usage led to a payback of under a month
  • Florida Power and Light – Riviera Beach and Fort Lauderdale, Florida
    Designed, implemented, and commissioned Intellution and Allen Bradley PLC’s controls for 4 burner management systems.
  • Alcan Aluminium – Kitimat, British Columbia
    PLC and HMI (Rockwell) for combustion control and burner management on 3 metal blending furnaces PLC and HMI (Modicon, concept, Intellution) for combustion control and burner management.?Optimized GE Fanuc 90/70 for scrubbers and their associated mechanical controls.?Management information system for process display throughout the plants local PC network.
  • Papeles Bio Bio – San Pedro, Chile
    Designed and implemented combustion control and burner management on a bark fired power boiler with Foxboro AW70.?Designed and implemented 2 burner dual fuel burner management system.
  • CMPC – Laja, Chile
    Designed, specified, and implemented control system on deep – bed bark fired boiler system. Combustion control, interface between burner management PLC and combustion control DCS.